Place them within comfortable reach of the shower, bath or vanity without obstructing doors or circulation. Test the position with a towel or robe before final fixing.
1 / 6About this piece
Product overview.
A 600 mm single towel rail in durable 304-grade stainless steel, with concealed wall fixings and coordinated Rushy finishes.
Product details
- Material: 304-grade stainless steel
- Nominal dimensions: 600 mm long x 74 mm high
Product details
Technical details.
Review the exact selected finish and measurements with your installer before ordering.
- Collection
- RUSHY
- Product code
- RUSHY-6501.TR
- Material
- 304-grade stainless steel
- Nominal dimensions
- 600 mm long x 74 mm high
Australia-wide delivery
Australia Post parcel options are shown for your order at checkout.
Delivery informationShopify-secured
Checkout, payments and order confirmation stay protected.
Open your bagSelected in Yennora
Ask the Laxe team about finish, fit or installation.
Speak with usCustomer reviews
Used in real homes.
No product reviews yet. Customers who have purchased this piece can share their experience.
Review this productSign in with the Shopify account used for your order. Reviews are checked before publishing.
Bathroom details guide
Bathroom Accessories FAQs
How to place towel rails, robe hooks, holders and finishing pieces for everyday convenience.
Yes, when the correct drill method, fixing and substrate support are used. Check for concealed plumbing, waterproofing and electrical services before drilling.
Use the same named finish and collection where possible, or compare samples and imagery carefully. Chrome, brushed, black, gunmetal and gold finishes can vary between manufacturers and ranges.
Wipe with a soft damp cloth and a mild pH-neutral cleaner, then dry the surface. Avoid abrasive pads and harsh chemical cleaners that can damage plated or powder-coated finishes.
Selection note
Place accessories around real routines
Think about where towels, robes and paper will be reached from, as well as where an accessory fits visually. Mark each position at full scale and check wall support before drilling finished surfaces.
Continue the room








